Skip to content
Nekker Labs
Nekker BIM/VDC Studio · Engineering & 3D Coordination

A complete 3D building model: from design sheets to daily operations.

We convert 2D drawings into clash-free 3D models across all MEP systems (HVAC, piping, electrical, fire protection), capture site conditions with laser scanning before walls close and hand over a structured digital twin for facility operations.

Federated multi-discipline 3D building modelEnlarge
00 / Hotel / Business CenterFederated 3D Building Model
StandardISO 19650
DetailLOD 300 - 500
Engineering HubTashkent / Almaty · UTC+5
ReachUZ · KZ · UAE · KSA · EU · US

Four building examples: what changes when moving to 3D.

Side-by-side comparison of traditional 2D delivery versus a coordinated 3D BIM workflow across key stages of the building lifecycle.

Explore the workshop in 3D Ventilation quotation in 3D
Mechanical plantroom, chiller header and valve access coordinationEnlarge
CASE 01Hotel / Business Center
CASE 01 · Hotel / Business Center
LOD 350-40048-72h pilot

Mechanical plantroom, chiller header and valve access coordination

In 2D drawings

Equipment is placed as schematic rectangles without filter-pull clearances, hanger rods, drain slopes or vertical offsets where ductwork crosses cable trays.

With Nekker 3D coordination

Units are modeled at true dimensions with service zones, beam bypasses and pipe slopes verified, and clean installation sections issued to site crews.

Client deliverable

48-72h pilot clash audit on one congested zone or a complete clash-free LOD 350-400 plantroom model.

Details
Converting 2D permit sets into a coordinated 3D construction modelEnlarge
CASE 02Residential / Commercial Complex
CASE 02 · Residential / Commercial Complex
Revit + IFCISO 19650

Converting 2D permit sets into a coordinated 3D construction model

In 2D drawings

Arch, Structural, HVAC and Plumbing sheets show conflicting elevations, quantities are counted manually and clashes surface only when crews drill on site.

With Nekker 3D coordination

All trades are federated in Revit/IFC, 2D gaps are logged in a clear RFI list before tender, and exact BOQ quantities are extracted directly from 3D.

Client deliverable

Coordinated .rvt / .ifc models, verified BOQ schedules and an actionable RFI log for design closure.

Details
Field 3D laser scanning and pre-fitout installation checksEnlarge
CASE 03Active Construction / Retrofit
CASE 03 · Active Construction / Retrofit
LiDAR 3D scanAs-Built Check

Field 3D laser scanning and pre-fitout installation checks

Without 3D site verification

Installers shift risers around concrete columns in the field while paper sheets remain unchanged, causing costly misfits in prefabricated ductwork and partitions.

After LiDAR field capture

Floors are laser-scanned, point clouds are overlaid onto the design model, actual deviations are mapped and the record model is updated accurately.

Client deliverable

As-built vs. design deviation heatmap and verified geometry before fabricating custom fittings.

Details
Concealed utility X-ray map and asset handover twin (LOD 500)Enlarge
CASE 04Building Operations & FM
CASE 04 · Building Operations & FM
LOD 500COBie + 360

Concealed utility X-ray map and asset handover twin (LOD 500)

Traditional paper handover

Drywall and ceilings hide all utilities. During leaks or valve replacements, technicians cut openings blindly and hunt through binders for equipment manuals.

With Nekker LOD 500 + COBie

Operators inherit a pre-drywall 360 visual map alongside a verified 3D model linked to serial numbers, warranties and COBie asset schedules.

Client deliverable

Operational digital twin (LOD 500 + COBie) giving exact locations and instant O&M documentation for every valve and unit.

Details

Three hidden costs of 2D-only project delivery.

Separate 2D drawings for architecture, structure and MEP look fine on flat sheets, yet break down on the jobsite and during decades of building operation.

Clear view of 2D conflicts: beams, sprinklers, trays and pipingEnlarge
3D SCENE 03Typical ceiling plenum clashes

Clear view of 2D conflicts: beams, sprinklers, trays and piping

Without 3D coordination, HVAC ducts collide straight into concrete girders, sprinkler lines cross electrical cable trays and insulated pipes block control panels on site.

Duct vs BeamSprinkler vs TraySite Crew Delays
Details
01

Expensive field rework

Ducts hitting structural beams, cable trays crossing sprinklers and tight ceiling plenums are discovered only after materials are ordered and crews are on site.

Industry benchmark: uncoordinated rework consumes 5-10% of build costDetails
02

Design vs. as-built drift

Installers reroute risers and equipment around columns on site, while paper drawings are never updated. Record drawings are outdated before handover.

Outcome: handover delays and quantity disputesDetails
03

A black box for facility teams

Once drywall and ceilings close, operators lose visibility of pipe runs, isolation valves, serial numbers and maintenance clearances.

Outcome: destructive wall cutting for routine repairsDetails

One golden thread of data from permit design to operations.

The 3D model progressively builds geometric precision and asset metadata following BIMForum LOD levels and ISO 19650.

How one building bay builds engineering detail across project stagesEnlarge
3D SCENE 04LOD 300 - 500 geometric progression

How one building bay builds engineering detail across project stages

From left to right: conceptual massing (LOD 300) and coordinated trade routing (LOD 350) evolve into flanged fabrication assemblies (LOD 400) and scan-verified operations (LOD 500).

LOD 300 -> 350LOD 400 SpoolsLOD 500 As-Built
Details
LOD 300Design
LOD 300 - Design intent modelEnlarge

Design intent model

Accurate sizes, elevations and routing for code checks, quantities and design review.

Design institute, ownerDetails
LOD 350Coordinate
LOD 350 - MEP coordinationEnlarge

MEP coordination

Federated Arch, Structural, HVAC, Plumbing, Electrical and ELV with clearance checks.

General contractor, supervisionDetails
LOD 400Build
LOD 400 - Construction & fabricationEnlarge

Construction & fabrication

Hanger details, plantroom assemblies, shop spool sheets and model-driven schedules.

MEP installers, procurementDetails
LOD 500Operate
LOD 500 - As-Built & operationsEnlarge

As-Built & operations

Scan-verified geometry, pre-drywall 360 utility map, manuals and COBie asset data.

Facility management, asset ownerDetails

Ready-to-deploy 3D scanners and cameras: on site within 24 hours.

Our stocked field hardware fleet in Tashkent and Almaty mobilizes on the next business day - eliminating hardware shipping delays and keeping site crews moving.

Dispatch SLA24 hours · Tashkent / Almaty
Plantroom Precision1.9 mm @ 10 m (TLS)
Shift CoverageUp to 5,000 m2 per shift
Handover Speed.e57 · .rcp · .rvt · IFC in 24-48h
Four field capture tiers tailored to every site engineering taskEnlarge
3D SCENE 05Ready-to-deploy field cases

Four field capture tiers tailored to every site engineering task

Millimeter-grade terrestrial laser scanning, mobile RTK-SLAM, LiDAR digital twin cameras and helmet-mounted 8K 360 capture cover congested plantrooms as well as multi-story structures.

24h mobilizationFactory-calibratedDirect Revit import
Details
Interactive Inspection · 360 / LiDAR vs 3D BIM

Drag the split slider: site reality capture over the 3D BIM twin.

Switch scenarios and click inspection pins directly inside the viewport to see how site scans map back to coordinated Revit and COBie deliverables.

Operational LOD 500 facility twin open on field tablet
Concealed MEP routing captured prior to drywall closure
Pre-drywall: 360 site capture (Insta360 X5)Handover: Operational LOD 500 Digital Twin
V-B04Concealed isolation valve station
Grid / node

Grids 4-5 / D · elev. +3.100

Capture hardware

Insta360 X5 8K Kit

Model status

LOD 500 + COBie

Verification: 400x400 mm access panel indexed to structural grid; eliminates blind drywall cutting.

Leica RTC360 - Millimeter-Grade Terrestrial 3D Laser ScannerEnlarge
01 · L2-TLS24h Site Dispatch

Leica RTC360

Millimeter-Grade Terrestrial 3D Laser Scanner

High-accuracy laser capture of congested mechanical plantrooms, chiller stations, heat exchangers, columns and steelwork for LOD 400-500 tie-ins.

On-site deployment scope

Plantrooms, chiller plants, pump rooms, boiler rooms, industrial bays and facades

2,000,000 pts/sec1.9 mm @ 10 m accuracy0.5 - 130 m range36 MP HDR · VIS · .e57 / .rcp
CHCNAV RS10 - Hybrid Handheld GNSS RTK + LiDAR SLAM ScannerEnlarge
02 · L2-SLAM24h Site Dispatch

CHCNAV RS10

Hybrid Handheld GNSS RTK + LiDAR SLAM Scanner

Continuous mobile 3D capture across exterior sites, facades, multi-story floorplates and underground parking on unified geodetic coordinates.

On-site deployment scope

Multi-story residential, malls, parking levels, campuses and MEP mains up to 5,000 m2 per shift

Up to 640,000 pts/sec< 10 mm relative precisionGNSS RTK + Visual SLAMUp to 120 m range · IP64
Matterport Pro3 LiDAR - 3D LiDAR Digital Twin & Floorplan CameraEnlarge
03 · L1-PRO24h Site Dispatch

Matterport Pro3 LiDAR

3D LiDAR Digital Twin & Floorplan Camera

Rapid laser and panoramic capture of interiors, mechanical floors and retrofit wings with asset-linked equipment records for facility teams.

On-site deployment scope

Hotels, hospitals, office towers, showrooms and LOD 500 operational handover models

0.5 - 100 m LiDAR+-20 mm @ 10 m accuracy134.2 MP panorama3D tour + .e57 + floorplans
Insta360 X5 8K Kit - Helmet-Mounted 8K 360 Pre-Drywall Capture KitEnlarge
04 · L1-36024h Site Dispatch

Insta360 X5 8K Kit

Helmet-Mounted 8K 360 Pre-Drywall Capture Kit

Fast site walkthrough documentation prior to drywall, screed and suspended ceiling closure, indexing every valve and conduit run to floorplans.

On-site deployment scope

Weekly construction progress walks and concealed in-wall or ceiling utilities without halting trades

8K 360 video · 72 MP photoDual 1/1.28" sensors · HDRHardhat + telescopic pole mountIP68 rugged · Floorplan-indexed

Four structured deliverables tailored to project stage.

Start with a low-risk 48-hour audit of a single zone and scale to full building coordination or dedicated embedded teams.

Modular 3D delivery scaled to project scope and construction stageEnlarge
3D SCENE 06Unified ACC / IFC engineering core

Modular 3D delivery scaled to project scope and construction stage

Whether you need a targeted zone audit, full 2D-to-BIM conversion, field scanning or dedicated engineers, deliverables run inside one shared coordinate core.

Revit + NavisworksAutodesk ACCOpenBIM IFC
Details
SKU-0148-72 hours

Express Clash Audit

Rapid 3D federation of one complex zone (plantroom, basement, typical floor) from your DWG/PDF/RVT.

  • Prioritized register of critical clashes
  • Equipment fit and clearance check
  • Accurate scope estimate for full 3D
Details
SKU-02LOD 300 - 400 · from 3 days

2D-to-BIM & MEP Coordination

Converting 2D drawings into a clash-free multi-discipline 3D model with installation sheets.

  • Native Revit (.rvt) and open IFC files
  • Model-linked BOQ schedules
  • Structured weekly coordination cycles
Details
SKU-03LiDAR + 360 · LOD 500

Field 3D Scanning (Scan-to-BIM)

Site reality capture with laser scanners and 360 cameras before hidden works are enclosed.

  • Visual X-ray record of walls and ceilings
  • Point-cloud vs. BIM deviation heatmap
  • Field-verified LOD 500 record model
Details
SKU-04Dedicated FTE · COBie

Dedicated Team & FM Handover

Embedded BIM engineers inside your ACC / Revizto workspace and operational twin preparation.

  • UTC+5 workflow aligned to your BEP
  • COBie tables and equipment manuals
  • CMMS / BMS handover readiness
Details

Strict geometric QA, six handover outputs and a UTC+5 hub.

Every model is built on deterministic engineering rules, licensed cloud collaboration and mandatory verification by a senior MEP coordinator.

Checking grids, slopes and service zones before issuing drawingsEnlarge
3D SCENE 07Automated clearance verification

Checking grids, slopes and service zones before issuing drawings

Every air-handling cabinet and valve header is validated with geometric clearance prisms - ensuring filter withdrawal, access doors and technician walkways remain unobstructed.

Clearance BoxesGrids & ElevationsMEP QA Sign-off
Details
01

Field 3D capture & input verification

On-site capture with LiDAR scanners and 360 cameras before wall closure, or structured completeness checks on received DWG/PDF packages and .e57 / .las point clouds logged as clear RFIs.

LiDAR360 CaptureInput ChecklistDetails
02

Precision 3D modeling & automated rule checks

Multi-discipline authoring in licensed Autodesk Revit and open IFC aligned with ISO 19650. Automated model checks verify clearances, elevations, pipe slopes, parameters and schedule accuracy.

RevitNavisworksIFC / IDSISO 19650Details
03

Senior MEP engineer sign-off

Before release, every congested plantroom, maintenance clearance, slope and quantity schedule undergoes rigorous verification and formal sign-off by a lead MEP coordinator.

MEP QA/QCClearance CheckSign-offDetails

Six concrete outputs at handover

01

Native Revit & Open IFC Models

Discipline-separated models on shared coordinates with clean naming and parameters.

Details
02

Clash & Resolution Register

Navisworks / Revizto reports tied to element GUIDs with documented routing fixes.

Details
03

Model-Driven BOQ Schedules

Verified counts of equipment, ductwork, piping and cable trays directly from 3D.

Details
04

Pre-Drywall 360 Utility Map

Floorplan-indexed visual timeline of concealed pipes, valves and conduits before closure.

Details
05

COBie Package & Manuals

Asset tags, serial numbers, warranty terms and linked manufacturer O&M documents.

Details
06

RFI Log & Revision Trail

Transparent record of 2D design discrepancies and ISO 19650 version history.

Details

Tashkent & Almaty Engineering Hub (UTC+5)

Real-time business-hours overlap with Central Asia, UAE and Saudi Arabia, plus morning handoff overlap with Europe and US East.

Tashkent / Almaty

Core engineering hub, on-site 3D capture and local design coordination

UTC+5
Dubai / Riyadh

Full business-hours overlap for live weekly MEP coordination calls

UTC+4 / UTC+3
Europe / US East

Morning handoff overlap for white-label sub-consulting and dedicated pods

UTC+1 / UTC-5

100% Licensed Software

Official Autodesk Construction Cloud (ACC), Revit, Navisworks and verified OpenBIM workflows.

Details

Engineering Neutrality

3D coordination follows project specifications and technical compliance strictly, separate from equipment supply.

Details

Strict Confidentiality

NDA-backed delivery with isolated per-project storage and zero third-party data reuse.

Details

Start with a 48-72 hour pilot 3D audit on one building zone.

Evaluate our modeling hygiene, clash reporting and engineering communication on a real fragment of your active project.

Isolating one congested zone to prove quality with zero commitmentEnlarge
3D SCENE 0848-72h single-zone 3D pilot cube

Isolating one congested zone to prove quality with zero commitment

No need to hand over the whole tower upfront - send one plantroom, basement or typical floor and receive an actionable 3D cutaway review in 48-72 hours.

1 target zone48-72h turnaroundSame-day NDA
Details
01

Share one project zone

Send a plantroom, basement parking or typical floor in DWG, PDF or RVT/IFC format.

Details
02

Receive a 3D review in 48-72h

We return a federated 3D snapshot, critical clash list and flagged maintenance clearances.

Details
03

Agree full scope & timeline

Align on target LOD, milestones and the right delivery model for your project.

Details
Contact for pilots and partnershipsinfo@nekkerlabs.com
Contacts
Rinat BaitemirProjects & Partnerships
+90 501 552 29 11
Alexandr KlimenkoKazakhstan · Almaty
+7 701 742 72 92

NDA and BIM Input Checklist provided on the same business day.

Explore the workshop in 3DRequest 48-hour audit
DIRECT PROJECT SUBMISSION

Attach drawings, equipment schedules, or BIM models

Upload PDF, DWG, RVT, IFC, Excel, or ZIP packages (up to 5 files, 100 MB total). Your submission creates an instant CRM dossier and alerts the regional desk.

Required scope
Project files or schedules (optional)
Drag and drop files here or click to browsePDF, XLSX, DWG, DXF, RVT, IFC, ZIP, PNG/JPG - up to 5 files, max 50 MB each / 100 MB batch
Offices & addresses
01 · Uzbekistan · Tashkent

OOO Nekker Labs

Uzbekistan, Tashkent, Yunusabad District, Bogishamol Street, 260A

Rinat Baitemirinfo@nekkerlabs.com
02 · Kazakhstan · Almaty

TOO Nekker

Kazakhstan, Almaty, Bostandyk District, Arkhat Microdistrict, Denis Ten Street, 2

Alexandr Klimenko+7 701 742 72 92
04 · USA · Wyoming

Nekker Labs

1309 Coffeen Avenue, STE 1200, Sheridan, Wyoming 82801

-35% PROMOPromotional offer: -35% on all services through end of 2026

Unlock -35% promotional BIM/VDC pricing for your region.

Select your region, service scope and building size. The -35% promotional discount and fast-track turnaround starting from 3 days unlock immediately after registering your contact details.

1. Project scope & region

Project / contract region
BIM/VDC service scope
Level of Development (LOD)
Facility type
TR · Turkey

2. Register project contact to unlock estimate

Promotional regional pricing and accelerated schedules are generated server-side upon lead registration.

Nekker Labs

Engineering equipment & 3D/BIM solutions.

Back to top