Skip to content
Nekker Labs
Engineering solutions · HVAC, Cooling & 3D/BIM

Engineering equipment.Informed decisions.

Duty-point engineering selection and package supply of commercial HVAC, industrial cooling, smoke control ventilation and 3D/BIM MEP coordination - from schedule review to verified delivery.

Ventilation · Chillers & Fan Coils · VRF · Controls · 3D / BIM

Nekker Labs industrial ventilation and HVAC engineering equipment
NEKKER LABS / ENGINEERINGNekker Labs industrial ventilation and HVAC engineering equipment

Systems designed to work together.

We supply commercial, industrial, hospitality, medical and residential projects, verifying every equipment selection at actual operating conditions.

Your requirements. Our attention to detail.

Start with an equipment schedule (PDF, Excel, DWG) or operating parameters and design codes for your project.

Explore section
01

Duty-point equipment selection

We review project loads, airflow, static pressure and ambient conditions, flagging missing parameters before quotation.

02

Technical comparison & value engineering

We compare fan curves, derated cooling tables, power draw, footprint and package scope across vetted factories.

03

Complete package & site delivery

We coordinate main equipment, options, hydronics, controls and logistics directly to your project site.

From 2D drawings to a clash-free 3D model and building digital twin.

We convert 2D design packages into coordinated 3D models (LOD 300-500), resolve MEP conflicts before crews mobilize on site, and capture hidden utilities for building operations.

Building services test stand

Rotate the stand to inspect duct joints, pipework and the cable tray.

Open the full stand

Engineering illustrations depicting typical Nekker Labs 3D coordination, laser scanning and building operations workflows.

3D model lifecycle across the building

LOD 300
LOD 300 - Design intent modelEnlarge

Design intent model

Accurate sizes, elevations and routing for code checks, quantities and design review.

Design institute, ownerDetails
LOD 350
LOD 350 - MEP coordinationEnlarge

MEP coordination

Federated Arch, Structural, HVAC, Plumbing, Electrical and ELV with clearance checks.

General contractor, supervisionDetails
LOD 400
LOD 400 - Construction & fabricationEnlarge

Construction & fabrication

Hanger details, plantroom assemblies, shop spool sheets and model-driven schedules.

MEP installers, procurementDetails
LOD 500
LOD 500 - As-Built & operationsEnlarge

As-Built & operations

Scan-verified geometry, pre-drywall 360 utility map, manuals and COBie asset data.

Facility management, asset ownerDetails

Four engagement formats

Full showcase & client brief

All 6 3D visuals, 4 real-world examples and 48-hour pilot.

Open the dedicated protected BIM/VDC web showcase featuring full-size engineering visuals, before-and-after project scenarios and 48-hour pilot details.

Open full presentationProtected web showcase · RU / UZ / EN

Every project starts with clear information.

A digital workspace for MEP designers and project engineers: structured factory catalogues, curve-based duty-point checks and schedule parsing.

Open catalogue lookup is available in the Designer Workspace; full project workflows use authenticated partner/engineer accounts.

Nekker LabsNEKKER LABSPlatform workflow diagram
01

Manufacturer catalogues

Performance curves, dimensional drawings and technical submittals in one workspace.

02

Parameter-based selection

Match airflow, static pressure, water temperatures and electrical limits to verified models.

03

Equipment schedules

Upload PDF or Excel schedules for structured engineering review and export.

Engineering equipment & 3D/BIM solutions.

HVAC equipment supply & 3D/BIM coordination.

Select a system discipline to review product scope, duty-point engineering checks and project delivery workflows.

Building types & Nekker Labs engineering package scope

Building sectorCore systems suppliedPre-order engineering checks3D / BIM & handover
Hotels & serviced apartmentsModular/screw chillers, quiet EC ducted fan coils, heat-recovery AHUsGuestroom NC acoustics, derated kW at +46...+50 °C, N+1 redundancyCeiling plenum & chiller plant coordination LOD 350-400
Shopping malls & office towersCentral AHUs, rooftops, chilled-water plants, VRF, fire/smoke dampersExternal static pressure, atrium smoke extraction, riser balancingMulti-discipline Revit / IFC clash resolution
Hospitals, clinics & cleanroomsHygienic medical AHUs, HEPA filtration, precision cooling, room pressure controlsCasing leakage class, filter stages, fan redundancyPre-drywall capture & LOD 500 asset handover
Industrial plants & logisticsAVZ roof, axial and centrifugal fans, explosion-proof Ex units, dry coolersAir density correction, corrosion/temperature ratings, Ex classificationLiDAR Scan-to-BIM & fabrication spooling
Residential complexes & parkingsJet-fan and ducted parking ventilation, stairwell pressurisation, VRFEI fire rating, smoke fan duty at 400 °C / 600 °C2D-to-BIM conversion & verified BOQ schedules

A clear path from brief to proposal.

01

Share your schedule or parameters

Send your HVAC schedule, drawings or design conditions and site constraints.

02

Engineering review & selection

We verify performance at operating conditions and assemble a complete system scope.

03

Proposal & coordinated delivery

We finalize submittals, factory lead times and delivery terms for your construction schedule.

Nekker Labs. Supporting your project.

Engineering distribution and 3D/BIM MEP studio helping design institutes, MEP contractors and developers connect verified equipment selection, clash-free 3D coordination and direct factory supply.

01

Decisions grounded in factory data

Every capacity and pressure figure traces back to published manufacturer curves and submittals.

02

Whole-system completeness

We check primary units alongside dampers, valves, controls, hydronics and maintenance clearances.

03

Single engineering workflow

Connecting equipment selection, 3D coordination and factory delivery under one roof.

For manufacturers and partners

Your equipment. New engineering projects.

We partner with HVAC and cooling manufacturers on official distribution, catalogue digitisation and specification support with MEP design teams.

Discuss a partnership

Direct answers on HVAC supply, cooling & 3D/BIM.

What building types and sectors does Nekker Labs support?

We deliver duty-point HVAC selection, factory-direct package supply and 3D/BIM MEP coordination for hotels, office towers, shopping malls, hospitals, cleanrooms, industrial plants, logistics facilities and high-rise residential projects.

Is Nekker Labs an official partner for AVZ ventilation equipment?

Yes. Nekker Labs is an official AVZ distribution partner supplying modular AHUs, duct, roof, centrifugal and axial fans, smoke extraction fans and fire dampers with verified curve-based selection.

How do you size chillers and fan coils for +46...+50 °C summer temperatures?

Standard catalogue ratings at +35 °C ambient overstate capacity in hot summer climates. We select chillers using factory high-ambient derating tables at +46...+50 °C and verify both total and sensible fan coil capacities at 7/12 °C chilled water and quiet fan speeds.

Can we send an HVAC equipment schedule (PDF, Excel, DWG) for engineering review and quotation?

Yes. Email your schedule or MEP drawings to info@nekkerlabs.com. Our engineers check airflow, static pressure, cooling duty, electrical supply, hydronic valves and controls, returning a clear proposal or documented value-engineering comparison.

What 3D / BIM & VDC services does Nekker Labs deliver?

We provide 48-72 hour single-zone clash audits, full 2D-to-BIM MEP modeling and coordination in Autodesk Revit and OpenBIM IFC (LOD 300-400) under ISO 19650, on-site LiDAR and 360 capture (Scan-to-BIM) before drywall closure, and As-Built LOD 500 + COBie digital twins.

How can MEP designers access catalogues and selection tools?

Designers can use the open Designer Workspace (/designers.html) without a password to browse ventilation and cooling series or submit schedules, and request free team accounts for multi-revision project workflows.

Technical sections & tools

Closer to manufacturer data.

Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.

Let’s start with your project.

Email your HVAC equipment schedule, 3D/BIM pilot drawings or supply enquiry for engineering review.

Write an email
Projects and partnershipsinfo@nekkerlabs.com
Contacts
Rinat BaitemirProjects & Partnerships
+90 501 552 29 11
Alexandr KlimenkoKazakhstan · Almaty
+7 701 742 72 92
DIRECT PROJECT SUBMISSION

Attach drawings, equipment schedules, or BIM models

Upload PDF, DWG, RVT, IFC, Excel, or ZIP packages (up to 5 files, 100 MB total). Your submission creates an instant CRM dossier and alerts the regional desk.

Required scope
Project files or schedules (optional)
Drag and drop files here or click to browsePDF, XLSX, DWG, DXF, RVT, IFC, ZIP, PNG/JPG - up to 5 files, max 50 MB each / 100 MB batch
Offices & addresses
01 · Uzbekistan · Tashkent

OOO Nekker Labs

Uzbekistan, Tashkent, Yunusabad District, Bogishamol Street, 260A

Rinat Baitemirinfo@nekkerlabs.com
02 · Kazakhstan · Almaty

TOO Nekker

Kazakhstan, Almaty, Bostandyk District, Arkhat Microdistrict, Denis Ten Street, 2

Alexandr Klimenko+7 701 742 72 92
04 · USA · Wyoming

Nekker Labs

1309 Coffeen Avenue, STE 1200, Sheridan, Wyoming 82801