Category 05 · Engineering Verification & Digital Platform
Duty-point equipment selection & HVAC schedule verification. Every Nekker Labs selection follows a strict engineering hierarchy: mandatory technical compatibility -> verified manufacturer data -> actual duty point and climate -> lifecycle efficiency -> commercial terms. Unknown parameters are flagged explicitly, never assumed.
Input Formats PDF · Excel · CSV · DOCX · DWG
Hierarchy Duty Point & Published Curves
For Designers Free Selection & Catalogues
Deliverable Comparison Matrix & Submittal
01 Category 05 · Engineering Verification & Digital Platform
Tools & services for MEP designers, chief engineers & procurement teams SEL-01 Line-by-line HVAC schedule audit Catching missing parameters and internal schedule contradictions before tender.
Completeness check across airflow, pressure basis (Esp / Pt), temperatures, voltage and enclosure rating Cross-checking item descriptions against model codes and electrical/thermal loads Flagging N+1 redundancy gaps, +46...+50 °C derating risks and missing control accessories SEL-02 Aerodynamic & thermal duty-point calculation Selecting on true system curve intersections rather than nominal catalogue headers.
System curve vs fan curve intersection with altitude and temperature density correction Total and sensible cooling verification at exact chilled-water and room conditions Distinct reporting of absorbed shaft power vs motor nameplate rating SEL-03 Documented value engineering & alternatives Transparent side-by-side technical submittals ready for consultant sign-off.
Unified comparison of airflow, static pressure, acoustics, efficiency, dimensions, weight and scope Explicit list of open technical clarifications for the lead MEP engineer Zero hidden downgrades of heat recovery, filtration stages or summer capacity SEL-04 Public Designer Workspace & partner project platform Instant open catalogue lookup paired with an authenticated multi-revision workspace.
Open Designer Workspace (/designers.html) for immediate catalogue search and schedule upload Browser-based interactive 3D MEP stand and assembly workshop (/bim-example.html) Authenticated project workspace with revision history and server-generated PDF/Excel submittals 02 Project support
Nekker Labs engineering data integrity rules Platform rule Why it matters How it appears in output Zero invented defaults Guessing static pressure or voltage causes costly site mismatches Missing inputs are flagged explicitly for designer clarification Candidate != Engineering approval Automated filtering finds candidates, but verified submittals govern supply Only reviewed and approved selections enter formal quotations Traceable source evidence Consultants need to verify every rating in seconds Every figure links to a specific catalogue page, curve or factory datasheet
03 UZ · KZ
Supporting MEP design institutes & owners across Central Asia Working alongside engineering teams across Uzbekistan and Kazakhstan:
Tashkent Almaty Astana Samarkand Shymkent Bukhara Atyrau Karaganda
Equipment categories & engineering services UZ HVAC supply, chillers & 3D/BIM in Uzbekistan KZ HVAC supply, ventilation & 3D/BIM in Kazakhstan UZ-01 Tashkent & Tashkent Region (OOO Nekker Labs) KZ-01 Almaty & Foothill Hub (TOO Nekker) KZ-02 Astana & Northern Kazakhstan (-40 C Winter) UZ-02 Samarkand, Bukhara, Navoi & Fergana KZ-03 Shymkent, Atyrau & Aktau (Ex & Marine) 01 Ventilation, AHUs & smoke control (AVZ) 02 High-ambient +50 °C chillers, fan coils & cooling (RØNIQ) 03 Multi-zone VRF/VRV, rooftops & heat pumps 04 HVAC control panels, PICV valves & BMS hydronics 06 Smoke Control 400/600 C, Pressurization & Jet Fans 07 Hygienic Medical AHUs, Cleanrooms & HEPA Filtration 08 LiDAR Scan-to-BIM & As-Built LOD 500 + COBie 09 AVZ - Industrial Fans, Smoke Exhaust & Fire Dampers 10 RØNIQ Systems - +50 C Chillers, Fan Coils & Rooftops 11 Industrial Plant Ventilation & Data Center Cooling G-01 Chiller-Fan Coil vs VRF for Hotels, Offices & Malls G-02 Specifying +46...+50 C High-Ambient Chillers G-03 High-Elevation (700-1,000 m) Fan & AHU Correction G-04 Arctic AHUs & Glycol Loops for -40 C Winters G-05 Smoke Control (400/600 C) & EI Damper Checklist G-06 When 3D/BIM (LOD 400) & Scan-to-BIM Pay Off BIM 3D / BIM (LOD 300 - 500) 04 FAQ
Questions on selection support & platform access Is equipment selection and catalogue access free for MEP designers? Yes. Design institutes and MEP engineers in Uzbekistan and Kazakhstan receive schedule reviews, duty-point selections and catalogue access free of charge.
How can I open the Designer Workspace right now? Visit /designers.html directly - no password is required to browse available ventilation and cooling series or upload an equipment schedule.
Technical sections & tools Closer to
manufacturer data. Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.