Skip to content
Nekker Labs
Engineering solutions · HVAC, Cooling & 3D/BIM
Industrial & Data Centers · 24/7 Mission-Critical HVAC

Industrial factory ventilation & Data Center precision cooling.

Duty-point equipment engineering and 3D/BIM coordination for 24/7 mission-critical facilities: Tier III data centers, mining/metallurgy, oil & gas, food, and pharmaceutical plants across Uzbekistan and Kazakhstan.

Data CentersN+1 / 2N · Free-cooling · High SHR
IndustryPlants, warehouses, mining, oil & gas
Special DutyEx (TR CU 012) · Stainless · Anti-corrosion
RetrofitsBrownfield LiDAR Scan-to-BIM

Mission-critical HVAC engineering scope

IND-01

Data Center (Tier III) precision cooling & PUE reduction

High sensible heat ratio (SHR > 0.90), tight temperature/humidity control, and redundant hydronics.

  • Perimeter CRAC/CRAH and In-Row precision cooling units with EC fans
  • Glycol free-cooling chillers delivering major annual power savings in Astana, Almaty, and winter Tashkent
  • Dual-ring chilled water headers, redundant pumping, and rack-level BMS telemetry
IND-02

Industrial plant ventilation, Ex zones & brownfield Scan-to-BIM

Removing process heat, dust, welding fumes, and corrosive vapors without halting plant operations.

  • Explosion-proof (Ex) and corrosion-resistant AVZ centrifugal/axial fans for oil & gas, chemical, and mining sites
  • High-capacity heat-recovery AHUs (rotary or glycol run-around) to cut winter heating bills
  • 2-5 mm terrestrial LiDAR Scan-to-BIM of live factories for clash-free retrofit ductwork routing

24/7 Facility Engineering Scenarios

Facility TypeCritical RequirementNekker Labs Solution
Data Center (Tashkent, Almaty, Astana)24/7 uptime, low PUE, N+1/2N redundancyFree-cooling N+1 chillers + CRAH / In-Row + BMS
Oil & Gas / Mining / Chemical (Atyrau, Navoi)Ex compliance, dust & H2S durabilityEx & anti-corrosion fans + coated coils
Live Factory RetrofitMissing as-built drawings, congested racksLiDAR Scan-to-BIM (2-5 mm) + LOD 400 coordination

Industrial clusters & tech parks

Supporting EPC contractors, industrial owners, and colocation operators across:

TashkentNavoiAlmatyAstanaAtyrauAktauShymkentKaraganda

Industrial & Data Center HVAC FAQ

How can we retrofit ventilation in an operating factory that has no up-to-date 3D drawings?

Our field team performs terrestrial LiDAR scanning (Scan-to-BIM) to capture existing columns, cranes, and piping to 2-5 mm accuracy, then coordinates clash-free LOD 400 ductwork and supplies the equipment package.

Technical sections & tools

Closer to manufacturer data.

Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.

Let’s start with your project.

Email your HVAC equipment schedule, 3D/BIM pilot drawings or supply enquiry for engineering review.

Write an email
Projects and partnershipsinfo@nekkerlabs.com
Contacts
Rinat BaitemirProjects & Partnerships
+90 501 552 29 11
Alexandr KlimenkoKazakhstan · Almaty
+7 701 742 72 92
DIRECT PROJECT SUBMISSION

Attach drawings, equipment schedules, or BIM models

Upload PDF, DWG, RVT, IFC, Excel, or ZIP packages (up to 5 files, 100 MB total). Your submission creates an instant CRM dossier and alerts the regional desk.

Required scope
Project files or schedules (optional)
Drag and drop files here or click to browsePDF, XLSX, DWG, DXF, RVT, IFC, ZIP, PNG/JPG - up to 5 files, max 50 MB each / 100 MB batch
Offices & addresses
01 · Uzbekistan · Tashkent

OOO Nekker Labs

Uzbekistan, Tashkent, Yunusabad District, Bogishamol Street, 260A

Rinat Baitemirinfo@nekkerlabs.com
02 · Kazakhstan · Almaty

TOO Nekker

Kazakhstan, Almaty, Bostandyk District, Arkhat Microdistrict, Denis Ten Street, 2

Alexandr Klimenko+7 701 742 72 92
04 · USA · Wyoming

Nekker Labs

1309 Coffeen Avenue, STE 1200, Sheridan, Wyoming 82801