Engineering Guide 05 · Fire & Life Safety
Pre-Order Checklist for Smoke Extraction (400/600 C) & EI Fire Dampers. Five common specification mistakes that cause smoke control systems in Tashkent, Almaty and Astana to fail fire-authority acceptance tests on first inspection.
Thermal Rating 400 C (2h) & 600 C (2h)
Cold Air Test Motor FLA checked at +20 C
Pressurization 20 - 150 Pa egress door range
Actuators NO (Spring) vs NC (Reversible)
01 Engineering Guide 05 · Fire & Life Safety
Critical Smoke-Control Audit Points CHK-01 Verify Motor Power on Cold Commissioning Air (+20 C) Fire acceptance tests run on +20 C ambient air, which is 2-3x denser than 400-600 C smoke.
Motors sized only for hot low-density gas trip circuit breakers during cold testing Confirm motor kW and breaker sizing for +20 C start-up or specify VFD torque/current limiting CHK-02 Match Damper Actuators Strictly (NO vs NC) Mixing up fire dampers (NO) and smoke dampers (NC) is the most common procurement mistake.
Fire dampers (NO) must fail-safe closed on power loss via spring-return actuators Smoke dampers (NC) open on fire command via reversible actuators matched to 24V or 230V fire panels 02 Project support
Pre-Procurement Verification Table Check Item What to Verify Risk if Missed Nekker Labs Verification Smoke fan thermal class 400 C / 120 min vs 600 C / 120 min Full rooftop fan replacement ordered by inspector Verified against compartment fire load calculation Roof curb & backdraft shutter Insulated vs uninsulated, roof pitch Water leaks and flange mismatch on roof Supplied as matched factory assembly (fan + curb + damper)
03 UZ · KZ
Smoke Control Audit & Supply Certified AVZ and partner life-safety packages delivered across:
Tashkent Almaty Astana Samarkand Shymkent Atyrau
Equipment categories & engineering services UZ HVAC supply, chillers & 3D/BIM in Uzbekistan KZ HVAC supply, ventilation & 3D/BIM in Kazakhstan UZ-01 Tashkent & Tashkent Region (OOO Nekker Labs) KZ-01 Almaty & Foothill Hub (TOO Nekker) KZ-02 Astana & Northern Kazakhstan (-40 C Winter) UZ-02 Samarkand, Bukhara, Navoi & Fergana KZ-03 Shymkent, Atyrau & Aktau (Ex & Marine) 01 Ventilation, AHUs & smoke control (AVZ) 02 High-ambient +50 °C chillers, fan coils & cooling (RØNIQ) 03 Multi-zone VRF/VRV, rooftops & heat pumps 04 HVAC control panels, PICV valves & BMS hydronics 05 Duty-point selection & HVAC schedule audit 06 Smoke Control 400/600 C, Pressurization & Jet Fans 07 Hygienic Medical AHUs, Cleanrooms & HEPA Filtration 08 LiDAR Scan-to-BIM & As-Built LOD 500 + COBie 09 AVZ - Industrial Fans, Smoke Exhaust & Fire Dampers 10 RØNIQ Systems - +50 C Chillers, Fan Coils & Rooftops 11 Industrial Plant Ventilation & Data Center Cooling G-01 Chiller-Fan Coil vs VRF for Hotels, Offices & Malls G-02 Specifying +46...+50 C High-Ambient Chillers G-03 High-Elevation (700-1,000 m) Fan & AHU Correction G-04 Arctic AHUs & Glycol Loops for -40 C Winters G-06 When 3D/BIM (LOD 400) & Scan-to-BIM Pay Off BIM 3D / BIM (LOD 300 - 500) 04 FAQ
Smoke Control Questions Can you audit our smoke-control fan and damper schedule before tender? Yes. Email your schedule to info@nekkerlabs.com for a line-by-line review of thermal classes, actuators and duty points.
Technical sections & tools Closer to
manufacturer data. Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.