Skip to content
Nekker Labs
Engineering solutions · HVAC, Cooling & 3D/BIM
Specialty Hub 06 · Fire & Smoke Control Systems

Smoke Extraction, Pressurization & Parking Jet Ventilation Systems.

We perform aerodynamic verification and supply complete life-safety ventilation packages: 400 C and 600 C (2-hour) smoke extraction fans, stairwell and elevator shaft pressurization units, enclosed parking impulse jet fans and EI fire/smoke dampers compliant with SHNK UZ and SN RK / SP RK.

Thermal Rating400 C (2h) & 600 C (2h)
Fire / Smoke DampersEI 60 · EI 90 · EI 120 · EI 180
Parkings & AtriumsImpulse Jet Fans + Axial/Roof Smoke Fans
Factory PartnerAVZ Lineup + Fire Control Panels

End-to-End Life-Safety Ventilation Scope

SMK-01

Roof, Centrifugal & Axial Smoke Extraction Fans

Dependable smoke evacuation from corridors, mall atriums, high-rises and underground parkings.

  • Upblast and side-discharge roof smoke fans complete with insulated roof curbs, backdraft shutters and drip pans
  • Centrifugal and inline/wall-mounted smoke extractors for dedicated fire-rated fan rooms
  • Certified 400 C (120 min) and 600 C (120 min) constructions in carbon and heat-resistant steels
SMK-02

Stairwell, Elevator Shaft & Refuge Area Pressurization

Maintaining smoke-free egress routes when doors open on the fire floor.

  • Axial and centrifugal pressurization fans for elevator shafts, smoke-proof stairwells and fire-service airlocks
  • Integrated electric supply-air preheaters engineered for Astana and Almaty winter conditions
  • Barometric/motorized pressure relief dampers and VFD differential-pressure control holding 20-150 Pa
SMK-03

Ductless Impulse (Jet) Ventilation for Underground Parkings

Eliminating bulky horizontal ductwork while preserving clear vehicle headroom.

  • Unidirectional and reversible jet fans (30-100 N thrust) serving dual-mode daily CO dilution and fire smoke control
  • Coordinated sequencing between jet fan zones, main exhaust shafts and CO / NOx gas detection
  • 3D/BIM verification of jet throw envelopes clearing structural drop beams, sprinklers and signage
SMK-04

Motorized Fire & Smoke Dampers

Complete damper schedules for fire compartment walls and multi-story smoke shafts.

  • Normally-open fire dampers with thermal-fuse spring-return actuators (24V / 230V)
  • Normally-closed wall and duct smoke dampers with reversible actuators and architectural grilles
  • Dual-action and explosion-proof damper constructions for industrial and energy facilities

Pre-Order Life-Safety Engineering Checks

System ElementCritical Procurement ErrorNekker Labs VerificationFire Commissioning Outcome
Hot gas density (400/600 C) vs +20 C cold testingSizing motor kW only for hot low-density gas causes breaker trips during +20 C commissioning testsMotor power verified for cold-air +20 C test density as well as fire duty pointClean start-up during fire-authority acceptance tests
Actuator type (spring-return vs reversible)Ordering reversible actuators where code mandates fail-safe spring-return fire dampersLine-by-line audit of every damper function, EI rating and 24V/230V control voltage100% compatibility with fire alarm matrix
Door opening force & shaft overpressure (20-150 Pa)Fixed-speed fan over-pressurizes stairwell so occupants cannot push egress doors openSizing pressure-relief dampers or differential-pressure VFD control loopsPasses physical door-pull and Pa Differential tests
Roof curb & shaft flange coordinationMismatched fan base flanges and clashes with roof parapetsMatched factory fan + curb + damper assemblies verified in 3D RevitFast crane rigging with zero rooftop steel rework

Smoke Control Supply Across Uzbekistan & Kazakhstan

Equipping high-rise towers, shopping malls, airports, hotels, parkings and warehouses:

TashkentAlmatyAstanaSamarkandShymkentBukharaAtyrauAktauKaragandaNavoi

Smoke Control & Fire Damper Questions

What is the difference between 400 C and 600 C smoke extraction fans?

Thermal classification (400 C for 2 hours vs 600 C for 2 hours) depends on calculated smoke gas temperatures for the compartment fire load (offices/apartments vs car parks/polymer storage). We match fan metallurgy and motor cooling strictly to the project fire engineering specification.

Do your deliveries include roof curbs, flexible high-temp connectors and factory-mounted damper actuators?

Yes. We supply complete matched assemblies including insulated/uninsulated roof curbs, high-temperature flexible connectors and fire/smoke dampers with factory-fitted actuators.

Technical sections & tools

Closer to manufacturer data.

Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.

Let’s start with your project.

Email your HVAC equipment schedule, 3D/BIM pilot drawings or supply enquiry for engineering review.

Write an email
Projects and partnershipsinfo@nekkerlabs.com
Contacts
Rinat BaitemirProjects & Partnerships
+90 501 552 29 11
Alexandr KlimenkoKazakhstan · Almaty
+7 701 742 72 92
DIRECT PROJECT SUBMISSION

Attach drawings, equipment schedules, or BIM models

Upload PDF, DWG, RVT, IFC, Excel, or ZIP packages (up to 5 files, 100 MB total). Your submission creates an instant CRM dossier and alerts the regional desk.

Required scope
Project files or schedules (optional)
Drag and drop files here or click to browsePDF, XLSX, DWG, DXF, RVT, IFC, ZIP, PNG/JPG - up to 5 files, max 50 MB each / 100 MB batch
Offices & addresses
01 · Uzbekistan · Tashkent

OOO Nekker Labs

Uzbekistan, Tashkent, Yunusabad District, Bogishamol Street, 260A

Rinat Baitemirinfo@nekkerlabs.com
02 · Kazakhstan · Almaty

TOO Nekker

Kazakhstan, Almaty, Bostandyk District, Arkhat Microdistrict, Denis Ten Street, 2

Alexandr Klimenko+7 701 742 72 92
04 · USA · Wyoming

Nekker Labs

1309 Coffeen Avenue, STE 1200, Sheridan, Wyoming 82801