Skip to content
Nekker Labs
Engineering solutions · HVAC, Cooling & 3D/BIM
City Engineering Hub · Astana & Northern Kazakhstan

Extreme-Winter Ventilation (-40 C), Free Cooling & 3D/BIM for Astana.

We equip government complexes, high-rise residential towers with heated podium parkings, hospitals, data centers and industrial facilities in Astana and Northern Kazakhstan with frost-protected AHUs, glycol free-cooling chillers, smoke control systems and clash-free 3D/BIM coordination.

Winter Design-35...-40 C frost & high wind loads
Energy RecoveryDual Heat Recovery & Free Cooling
KZ ContractingLocal supply via TOO Nekker to Astana
3D / BIM ModelsLOD 300-500 · Revit · Navisworks · IFC

Engineering Solutions for Astana Continental Extremes

AST-01

Arctic-Grade AHUs with Anti-Freeze Protection Down to -40 C

Reliable air handling for Left-Bank towers, schools, clinics and public buildings.

  • Thermal-break 50-60 mm mineral wool casings and perimeter-heated intake dampers
  • Sorption rotary, counterflow plate and run-around glycol heat exchangers with active defrost control
  • 3-way mixing skids and dual water/air freeze-stat protection for hydronic heating coils
AST-02

Free-Cooling Chillers & 35-50% Propylene Glycol Hydronics

Harvesting Astana cold ambient air 6-7 months per year for data centers, clinics and offices.

  • Integrated free-cooling chillers and dry coolers for year-round process and server cooling
  • Full thermal and pressure-drop recalculation of heat exchangers, pumps and fan coils for 40-50% glycol
  • Low-ambient head-pressure control and crankcase heaters for reliable winter start-up
AST-03

Enclosed Heated Parking Ventilation & Smoke Extraction

Complete CO dilution, jet ventilation and fire-rated smoke control for Astana residential podiums.

  • Impulse jet fans, 400/600 C roof/axial smoke extractors and heavy-duty ramp air curtains
  • Pre-heated stairwell and elevator shaft pressurization units compliant with SN RK
  • Spring-return fire dampers and reversible smoke dampers with factory actuators
AST-04

Remote & On-Site 3D/BIM Coordination for Capital Projects

Resolving congested technical floors, district-heating substations (ITP) and parkings ahead of winter pours.

  • 48-72 hour clash audits across HVAC, district heating skids, plumbing and fire sprinklers
  • LOD 400 spooling and bill-of-quantities extraction for prefabrication
  • Field LiDAR Scan-to-BIM and LOD 500 digital twin handover for facility operators

Critical Engineering Checks for Astana & Northern Kazakhstan

Climate / Structural FactorStandard Equipment RiskNekker Labs SpecificationOperational Reliability
-35...-40 C winter design temperaturePlate heat exchanger icing and ruptured first-row heating coil tubesPre-heat / bypass defrost logic, return-water temp control and tube velocity sizingZero freeze-ups during January cold snaps
40-45% glycol concentration in chilled loops12-15% specific-heat penalty and 25-40% higher pump head lossExplicit glycol selection of chillers, pumps, fan coils and PICV valvesFull summer cooling capacity and balanced flows
Severe steppe wind & blowing snowSnow ingestion into AHU filters and wind backdraft on roof exhaustsSnow-trap intake louvers, droplet eliminators and reinforced roof curbsDry filter banks and stable airflow
Low-headroom podium parkingsCrossing main ducts violate minimum 2.1-2.2 m vehicle clearanceJet-fan layout and 3D inter-beam routing in Autodesk RevitPreserved parking stalls and clear height

Astana, Central & Northern Kazakhstan Delivery Network

Direct freight delivery and engineering support across major northern and central cities:

Astana (Yesil, Nura, Almaty, Saryarka Districts)KaragandaKokshetauPavlodarEkibastuzKostanayPetropavlovskUst-KamenogorskSemey

Astana HVAC & BIM Project Questions

How is equipment contracted and shipped to Astana?

Contracts are executed via our Kazakh entity TOO Nekker, with direct truckload delivery of AVZ ventilation units and RØNIQ cooling systems straight to Astana job sites with full RK certificates.

Do you supply freeze-protection control panels for Astana hydronic AHUs?

Yes. Every control panel and mixing assembly includes capillary air freeze stats, immersion return-water sensors, spring-return intake actuators and pre-heat start sequences.

Technical sections & tools

Closer to manufacturer data.

Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.

Let’s start with your project.

Email your HVAC equipment schedule, 3D/BIM pilot drawings or supply enquiry for engineering review.

Write an email
Projects and partnershipsinfo@nekkerlabs.com
Contacts
Rinat BaitemirProjects & Partnerships
+90 501 552 29 11
Alexandr KlimenkoKazakhstan · Almaty
+7 701 742 72 92
DIRECT PROJECT SUBMISSION

Attach drawings, equipment schedules, or BIM models

Upload PDF, DWG, RVT, IFC, Excel, or ZIP packages (up to 5 files, 100 MB total). Your submission creates an instant CRM dossier and alerts the regional desk.

Required scope
Project files or schedules (optional)
Drag and drop files here or click to browsePDF, XLSX, DWG, DXF, RVT, IFC, ZIP, PNG/JPG - up to 5 files, max 50 MB each / 100 MB batch
Offices & addresses
01 · Uzbekistan · Tashkent

OOO Nekker Labs

Uzbekistan, Tashkent, Yunusabad District, Bogishamol Street, 260A

Rinat Baitemirinfo@nekkerlabs.com
02 · Kazakhstan · Almaty

TOO Nekker

Kazakhstan, Almaty, Bostandyk District, Arkhat Microdistrict, Denis Ten Street, 2

Alexandr Klimenko+7 701 742 72 92
04 · USA · Wyoming

Nekker Labs

1309 Coffeen Avenue, STE 1200, Sheridan, Wyoming 82801