City Engineering Hub · Astana & Northern Kazakhstan
Extreme-Winter Ventilation (-40 C), Free Cooling & 3D/BIM for Astana. We equip government complexes, high-rise residential towers with heated podium parkings, hospitals, data centers and industrial facilities in Astana and Northern Kazakhstan with frost-protected AHUs, glycol free-cooling chillers, smoke control systems and clash-free 3D/BIM coordination.
Winter Design -35...-40 C frost & high wind loads
Energy Recovery Dual Heat Recovery & Free Cooling
KZ Contracting Local supply via TOO Nekker to Astana
3D / BIM Models LOD 300-500 · Revit · Navisworks · IFC
01 City Engineering Hub · Astana & Northern Kazakhstan
Engineering Solutions for Astana Continental Extremes AST-01 Arctic-Grade AHUs with Anti-Freeze Protection Down to -40 C Reliable air handling for Left-Bank towers, schools, clinics and public buildings.
Thermal-break 50-60 mm mineral wool casings and perimeter-heated intake dampers Sorption rotary, counterflow plate and run-around glycol heat exchangers with active defrost control 3-way mixing skids and dual water/air freeze-stat protection for hydronic heating coils AST-02 Free-Cooling Chillers & 35-50% Propylene Glycol Hydronics Harvesting Astana cold ambient air 6-7 months per year for data centers, clinics and offices.
Integrated free-cooling chillers and dry coolers for year-round process and server cooling Full thermal and pressure-drop recalculation of heat exchangers, pumps and fan coils for 40-50% glycol Low-ambient head-pressure control and crankcase heaters for reliable winter start-up AST-03 Enclosed Heated Parking Ventilation & Smoke Extraction Complete CO dilution, jet ventilation and fire-rated smoke control for Astana residential podiums.
Impulse jet fans, 400/600 C roof/axial smoke extractors and heavy-duty ramp air curtains Pre-heated stairwell and elevator shaft pressurization units compliant with SN RK Spring-return fire dampers and reversible smoke dampers with factory actuators AST-04 Remote & On-Site 3D/BIM Coordination for Capital Projects Resolving congested technical floors, district-heating substations (ITP) and parkings ahead of winter pours.
48-72 hour clash audits across HVAC, district heating skids, plumbing and fire sprinklers LOD 400 spooling and bill-of-quantities extraction for prefabrication Field LiDAR Scan-to-BIM and LOD 500 digital twin handover for facility operators 02 Project support
Critical Engineering Checks for Astana & Northern Kazakhstan Climate / Structural Factor Standard Equipment Risk Nekker Labs Specification Operational Reliability -35...-40 C winter design temperature Plate heat exchanger icing and ruptured first-row heating coil tubes Pre-heat / bypass defrost logic, return-water temp control and tube velocity sizing Zero freeze-ups during January cold snaps 40-45% glycol concentration in chilled loops 12-15% specific-heat penalty and 25-40% higher pump head loss Explicit glycol selection of chillers, pumps, fan coils and PICV valves Full summer cooling capacity and balanced flows Severe steppe wind & blowing snow Snow ingestion into AHU filters and wind backdraft on roof exhausts Snow-trap intake louvers, droplet eliminators and reinforced roof curbs Dry filter banks and stable airflow Low-headroom podium parkings Crossing main ducts violate minimum 2.1-2.2 m vehicle clearance Jet-fan layout and 3D inter-beam routing in Autodesk Revit Preserved parking stalls and clear height
03 UZ · KZ
Astana, Central & Northern Kazakhstan Delivery Network Direct freight delivery and engineering support across major northern and central cities:
Astana (Yesil, Nura, Almaty, Saryarka Districts) Karaganda Kokshetau Pavlodar Ekibastuz Kostanay Petropavlovsk Ust-Kamenogorsk Semey
Equipment categories & engineering services UZ HVAC supply, chillers & 3D/BIM in Uzbekistan KZ HVAC supply, ventilation & 3D/BIM in Kazakhstan UZ-01 Tashkent & Tashkent Region (OOO Nekker Labs) KZ-01 Almaty & Foothill Hub (TOO Nekker) UZ-02 Samarkand, Bukhara, Navoi & Fergana KZ-03 Shymkent, Atyrau & Aktau (Ex & Marine) 01 Ventilation, AHUs & smoke control (AVZ) 02 High-ambient +50 °C chillers, fan coils & cooling (RØNIQ) 03 Multi-zone VRF/VRV, rooftops & heat pumps 04 HVAC control panels, PICV valves & BMS hydronics 05 Duty-point selection & HVAC schedule audit 06 Smoke Control 400/600 C, Pressurization & Jet Fans 07 Hygienic Medical AHUs, Cleanrooms & HEPA Filtration 08 LiDAR Scan-to-BIM & As-Built LOD 500 + COBie 09 AVZ - Industrial Fans, Smoke Exhaust & Fire Dampers 10 RØNIQ Systems - +50 C Chillers, Fan Coils & Rooftops 11 Industrial Plant Ventilation & Data Center Cooling G-01 Chiller-Fan Coil vs VRF for Hotels, Offices & Malls G-02 Specifying +46...+50 C High-Ambient Chillers G-03 High-Elevation (700-1,000 m) Fan & AHU Correction G-04 Arctic AHUs & Glycol Loops for -40 C Winters G-05 Smoke Control (400/600 C) & EI Damper Checklist G-06 When 3D/BIM (LOD 400) & Scan-to-BIM Pay Off BIM 3D / BIM (LOD 300 - 500) 04 FAQ
Astana HVAC & BIM Project Questions How is equipment contracted and shipped to Astana? Contracts are executed via our Kazakh entity TOO Nekker, with direct truckload delivery of AVZ ventilation units and RØNIQ cooling systems straight to Astana job sites with full RK certificates.
Do you supply freeze-protection control panels for Astana hydronic AHUs? Yes. Every control panel and mixing assembly includes capillary air freeze stats, immersion return-water sensors, spring-return intake actuators and pre-heat start sequences.
Technical sections & tools Closer to
manufacturer data. Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.