Turkey Hub · Nekker Labs Antalya
High-ambient HVAC supply, industrial cooling & 3D/BIM across Turkey. Operating from our Antalya office (Konyaalti, Hurma, 195 Street, 11B), we support developers, hospitality groups, industrial facilities and MEP contractors across Istanbul, Antalya, Ankara and Izmir with coastal-grade HVAC equipment selection and 3D/BIM MEP coordination (LOD 300-500).
Turkey Office Antalya · Konyaalti, 195 St 11B
Codes & Standards TS EN · TBDY 2018 · ISO 19650
Design Climate Summer +42...+48 C · Coastal Salt Air
Fast Kickoff 48-72h Pilot Audit · TR / EN / RU
01 Turkey Hub · Nekker Labs Antalya
Core solutions for hospitality, commercial and industrial builds in Turkey TR-01 Mediterranean hospitality resorts & coastal clinics Silent EC fan coils, corrosion-protected +48 C chillers and heat-recovery AHUs.
High-ambient chiller derating verified at +46...+48 C without peak-season capacity loss Hydrophilic/epoxy coil coatings and marine-grade enclosures for Antalya, Bodrum and Izmir Ultra-quiet ducted and cassette EC fan coils engineered for 5* guestroom noise criteria TR-02 Seismic HVAC bracing (TBDY 2018) & smoke control Code-compliant fire/smoke extraction and seismic restraint packages.
400/600 C smoke extraction, stairwell pressurisation and enclosed carpark jet fans Seismic sway bracing, flexible joints and vibration isolators aligned to TBDY 2018 Complete industrial AVZ fan and modular AHU packages for Kocaeli, Bursa and Gaziantep plants TR-03 3D/BIM MEP coordination (LOD 350-400) for Turkish contractors Resolving ceiling plenum and plantroom clashes prior to site mobilization.
48-72h single-zone clash audit on congested chillers, risers or underground garages Multi-trade Autodesk Revit, Navisworks and OpenBIM IFC modeling aligned to ISO 19650 Model-derived bills of quantities (BOQ) and installation sections for site crews TR-04 LiDAR Scan-to-BIM & pre-drywall 360 documentation As-built point cloud verification for brownfield renovations and hotel retrofits.
Rapid Leica / SLAM / 360 mobilization across Antalya, Istanbul, Ankara and Izmir Color deviation heatmaps comparing installed piping/ducts to IFC design intent Complete As-Built LOD 500 + COBie handover package for hotel engineering teams 02 Project support
Turkish site conditions verified before ordering or mobilizing Turkish Site Factor Unchecked Risk Nekker Labs Verification Project Outcome High Seismic Zones (TBDY 2018) Rigid pipe anchors shear flanges under seismic drift Seismic clearances and flexible restraints verified inside the 3D BIM model Smooth site inspection sign-off Coastal Salt Mist (Antalya / Izmir) Rapid fin corrosion on aluminum outdoor coils Epoxy coil coating specs and stainless hardware verification Extended plant lifespan Tight Resort Opening Schedules Crew standstills caused by ceiling clash rework Phased 3D coordination LOD 350-400 starting from 3 days On-time seasonal handover
03 TR · TURKEY
Turkish cities & industrial hubs covered Our Antalya team supports sites and engineering offices nationwide:
Antalya Istanbul Ankara Izmir Bursa Kocaeli / Gebze Gaziantep Mersin Mugla / Bodrum
Equipment categories & engineering services UZ HVAC supply, chillers & 3D/BIM in Uzbekistan KZ HVAC supply, ventilation & 3D/BIM in Kazakhstan UZ-01 Tashkent & Tashkent Region (OOO Nekker Labs) KZ-01 Almaty & Foothill Hub (TOO Nekker) KZ-02 Astana & Northern Kazakhstan (-40 C Winter) UZ-02 Samarkand, Bukhara, Navoi & Fergana KZ-03 Shymkent, Atyrau & Aktau (Ex & Marine) 01 Ventilation, AHUs & smoke control (AVZ) 02 High-ambient +50 °C chillers, fan coils & cooling (RØNIQ) 03 Multi-zone VRF/VRV, rooftops & heat pumps 04 HVAC control panels, PICV valves & BMS hydronics 05 Duty-point selection & HVAC schedule audit 06 Smoke Control 400/600 C, Pressurization & Jet Fans 07 Hygienic Medical AHUs, Cleanrooms & HEPA Filtration 08 LiDAR Scan-to-BIM & As-Built LOD 500 + COBie 09 AVZ - Industrial Fans, Smoke Exhaust & Fire Dampers 10 RØNIQ Systems - +50 C Chillers, Fan Coils & Rooftops 11 Industrial Plant Ventilation & Data Center Cooling G-01 Chiller-Fan Coil vs VRF for Hotels, Offices & Malls G-02 Specifying +46...+50 C High-Ambient Chillers G-03 High-Elevation (700-1,000 m) Fan & AHU Correction G-04 Arctic AHUs & Glycol Loops for -40 C Winters G-05 Smoke Control (400/600 C) & EI Damper Checklist G-06 When 3D/BIM (LOD 400) & Scan-to-BIM Pay Off BIM 3D / BIM (LOD 300 - 500) 04 FAQ
Questions on Turkey HVAC & BIM delivery Does Nekker Labs provide Turkish, English and Russian project communication from Antalya? Yes. Our regional hub in Antalya handles technical submittals, BIM coordination calls and client proposals seamlessly in Turkish, English and Russian.
Can we commission standalone 3D/BIM coordination or Scan-to-BIM without equipment procurement? Yes. BIM/VDC Studio services operate completely independently via fixed-scope packages or dedicated FTE seats.
Technical sections & tools Closer to
manufacturer data. Open the public Designer Workspace, browse engineering category guides or sign in to the project platform.